ELE Energy & Investment

Istanbul & Dubai

Dubai, UAE



Energy from Waste

Waste Throughput

1'890'000 t/a

Energy Recovered

electricity

Thermal Power

5 x 124,6 MWth

dubai

The City of Dubai chose a joint venture between Hitachi Zosen Inova and BESIX (Belgium) to build the biggest EfW plant in the world. The two companies are general contractors for the turnkey plant, as well as serving as operators and minority shareholders in the project company for 35 years. It’s not just the size of the plant that’s impressive: net energy efficiency of more than 31% also puts it at the very top of the international rankings. Delivery of the project is a key componentof Dubai’s sustainability strategy.

Facts

    • Type of system: air-cooled HZI reciprocating grate
    • Fuel: municipal and industrial waste
    • Calorific value: 7-14 MJ/kg
    • Maximum throughput per line: 53.6 t/h
    • Number of lines: five
    • Boiler design: four-pass boiler
    • Flue gas treatment: dry sorption with hydrated lime and activated carbon, SNCR


Clients

    • Dubai Waste Management Company
    • BOT / Concession: Dubai Municipality


Commencement of Operation

    • 2024


Components Supplied

    • In a joint venture with the BESIX group, EPC contractor for the turnkey plant, including building construction. After financing, construction and commencement of operation, the plant will be run for 35 years by the consortium before being handed over to the client.


Istanbul, TUR



Energy from Waste

Throughput

1'000'000 t/a

Energy Recovered

electricity

Thermal energy

3 x 86,8 MWth

istanbul
istanbul
istanbul

Turkey’s first EfW plant will also be the largest in Europe. Located right next to Istanbul Airport, the plant, which commences operation in 2021, will have three lines thermally treating 15% of the solid municipal waste to generate 70 Mwel of electricity. Construction of the plant is creating value in the region, with more than a fifth of all components manufactured by local companies and the construction itself relying 100% on local workers.

Facts

    • Type of system: air-cooled HZI reciprocating grate
    • Fuel: municipal solid waste
    • Calorific value: 6.0-9.0 MJ/kg
    • Maximum throughput per line: 46 t/h
    • Number of lines: three
    • Boiler design: five-pass boiler
    • Flue gas treatment: dry sorption with hydrated lime and activated carbon, SNCR


Client

    • Istanbul Metropolitan Municipality (IMM)


Commencement of Operation

    • 2021


Components supplied by HZI

    • In a consortium with the Turkish partner Makyol, EPC contract for the complete turnkey plant, including the building construction and operation for one year.